Get a custom conveyor layout, available in .dwg, .dxf, or .pdf formats.
Location: Sarnia, Ontario, Canada
Sarnia’s wastewater treatment facility required a complex sludge conveying solution spanning 125 feet with substantial elevation gain in a space-constrained environment. The project demanded both engineering precision and aggressive timeline execution. Through strategic planning and proven Pathwinder technology, the installation achieved full operational status in under two weeks from shipment – a remarkable achievement for elevated conveyor deployment.
125-foot enclosed conveyor handling steep elevation without material spillage
Large custom maintenance platform surrounding conveyor discharge
304 stainless steel construction providing stability across extreme temperature ranges
Control panel optimization with heating elements and weatherproofing
~100% on-time project delivery in under two weeks
Reduced installation complexity through modular design
Optimized project costs through proven technology
Enhanced long-term reliability and safety
Serpentix is fully compliant with the Build America, Buy America Act—ensuring high-quality, American-made materials for federally funded projects.